As per the MoU, the Deccan Park needs to be integrated with the Qutb Shahi Heritage Park. The 200 meter wide frontage would serve as the main entry to the Heritage Park and house visitor facilities including parking, amphitheatre and site interpretation centre as per the approved master plan for the complex.

The existing modern inappropriate temporary sheds and other facilities such as toy train etc. needs to be dismantled. Modern deep water tanks have been built in the Deccan Park which pose health and safety hazards for visitors and need to be removed.

OUTCOME:

  • Discussions have been held with the Quli Qutb Shahi Urban Development Authority – the current custodian of the site – for permission to commence works.
  • The Commissioner – Greater Hyderabad Municipal Corporation (GHMC) visited the site for review of the proposed development of the area.
  • GHMC City Planner reviewed the existing structures of the site and submitted report to authorities for further perusal.
  • Meetings were held with the Chief City Planner and Additional Chief City Planner, GHMC on the proposed development of the site following removal of inappropriate structures.

NEXT STEPS:

The discussions are to be further carried out with the Quli Qutb Shah Urban Development Authority and Ministry of Urban Development, Govt of Telengana through 2016 to commence works.