OUTCOME:
- The roof was repaired and the external surface which had signs of deterioration was re-plastered.
- The internal surface was cleaned and there was a need for final finish of the surface.
- The details on the front facade – the minarets, the battlements and the ornamentation needed repairs at several portions.
- Finials which were missing on the minarets were reinstated.
IMPACT:
Conservation works on the structure have been completed and a plinth protection with landscaping of its setting will be carried out together with landscape works in the Sultan Quli’s garden enclosure.