TY - ART T1 - Study Models for project, "Manufacturing Void" Y1 - 2018 A1 - Sameep Padora A1 - Harshat Verma A1 - Aparna Dhareshwar A1 - Sandeep Patwa JA - Vijay Transtech Factory PB - sP + a UR - http://www.sp-arc.net/ N1 -

Our project for a factory manufacturing steel parts maintains a form finish, cast in place hard concrete edge while fragmenting its mass to retain an existing low lying seasonal pond. The building allows for this temporal ecological phenomena through an 80 foot cantilevered corner which also visually connects the street to a central courtyard, thus, hus the two parameters of preserving the existing seasonal ecology as well as the climatic device of the courtyard generate an extroverted factory type.

ID - AZ-CF-186546 ER -